
Condominium interiors
Full-home design for private residences, from layout changes and lighting plans to the last cushion. We coordinate MCST approvals and work hours.
- Typical size
- 1,000 – 3,200 sq ft
- Build
- 10 – 14 weeks
- From
- S$120k
Interior architecture for Singapore's condominiums, HDB flats and landed homes.
The studio
We design homes that feel settled from the first evening: calm, crafted to the millimetre, and plainly yours.
Practice

Full-home design for private residences, from layout changes and lighting plans to the last cushion. We coordinate MCST approvals and work hours.

BTO and resale flats planned to feel larger than their floor area. We handle HDB permits and use registered contractors for every hacking and wet-works job.

Terraces, semi-Ds and bungalows, designed alongside your architect and QP so the interior and the building read as one piece.

Wall panelling, wardrobes and kitchens built in our own workshop in Sungei Kadut, with rift-cut veneers matched sheet by sheet.

The final layer: loose furniture, art, lamps and textiles, sourced and installed so the home is ready on handover day.
Material schedule
Every project gets a schedule like this one. Each code appears on the drawings, the samples board and the workshop's cutting list.
| Code | Sample | Material | Finish | Where |
|---|---|---|---|---|
| WD-01 | American walnut | Rift-cut veneer, matte lacquer | Wall panels, corridor, headboard | |
| MT-01 | Stainless steel 304 | Hairline brushed | Kitchen island, worktop | |
| ST-01 | Travertine | Honed, filled | Dining table base | |
| FB-02 | Wool bouclé | Oat, 680 g/m² | Sofas, dining chairs | |
| FL-01 | European oak | Wide plank, natural oil | All floors | |
| LT-03 | Concealed LED | 2700 K, CRI 95 | Cove lighting, joinery |
Process
A site visit, measured survey and an honest budget conversation before any drawing.
Layouts, the material schedule and photoreal renders of every room, revised until they're right.
Permits, hacking, wet works and workshop joinery, with a weekly photo report from site.
Furniture, art and lamps go in, then a walkthrough with a defects list we close within 14 days.
Before and after
Drag the line. Left is the unit the week we got the keys; right is the same room at handover, twelve weeks later.
Before · Bare shell
After · Handover
Project brief
Pick the property, the scope and the size. The ballpark updates as you go, and your choices carry into the form below.
S$135,000 – S$165,000
Est. build on site10 – 12 weeks
A ballpark from typical KAYU projects of this kind. The site visit and measured survey set the real figure.
Send brief via WhatsAppYour brief is filled into the form below.
Consultation